Hi everyone, as you may have seen from my network section thread my VM connection has massive issues, and contract is up in Jan.
So looking to move, well possibly, the issue is we are students so can't spend more on the whole then we do now (£35 a month for 50mb) but we have no phone line, so cost must include installing a phone line, other issue is we all move out in September, so can only be a 9 month contract basically.
Other possibility is to stick with VM and drop down to 30mb to save a little money and keep what we have.
So ideas?