Hello boys,
I placed an order around the 30th August for an Asus Blitz and an Enermax PSU.
I guess my first question would be:
Is there a due date for the Blitz? I originally ordered as part of a larger order, with my 2900XT, but it was then out of stock, so I part shipped the 2900XT. It then notified me by email that it was in stock, so I ordered it. Evidently, there were people before me, so I wasn't allocated one of the ones that came into stock that time.
Okay, if you understood all that, on to my second question:
The order that I have place contains the Enermax PSU and the Asus Blitz. Could I be rather cheeky and ask if its possible to part ship the Enermax, so I can continue with the build (theres a water cooling system going in at present, so the PSU would be helpful, in working out spacial requirements) and have the Blitz shipped after it comes back into stock?
Cheers dudes!
Steve