First it's worth reading the history of this project!
Phase 1: Project "Integration" :: I don't want no cables.
Phase 2: Sparks may fly
Phase 3: Potential Problems
Phase 4: So the TV landed
Phase 5: Digital Wardrobe: TV Mount
Phase 6: Never knew mounting would be so hard....
Phase 7: Heave ho - its up!
Phase 8: Mini-Update
Phase 9: Bits arrived
Well it was time to tidy it up - I had patched in cables all messy and not taken care of it - this weekend I cleaned it out - and put my 360 back in - and sorted all the cabling.
In the photo you can see my Dell 2724 switch (I have a spare 16 port Gigabit switch in the bottom of the cabinet)
You can see my Thecus 5200 NAS box - which is loaded up with drives for storage, my Silverstone SUGO box which is my gaming/LAN rig, and the BTX system at the end is my Domain controller for my house (and back's up works Exchange box) on top of it is an Avvocent IPKVM.
There are 2 PIII 1.26GHz Retail CPUs for a future upgrade
I leave my USB Thecus Nano drive plugged in to my 5200 so I can remote access it - and all of my home network is Gigabit. I am using the Thecus as the Switch on the shelf - feeding in to the shelf above.
You can see my 360 sitting on top of the SkyHD box.
And the best thing? Its tidy!