I ordered a
ZM-MFC1-PLUS-BLACK - Zalman ZM-MFC1 Plus Black Multi Fan Controller
and
120mm Scythe S-FLEX SFF21F Fan 1600 RPM
1 of each...But I don't want the fan controller anymore, also I have free shipping because of Hexus, but now just the fan on It's own is going to cost me shipping. So can the scan guys cancel the whole order and I will order the fan on its own with its own shipping
Also can I cancel the order myself? I havent gotten an email about the order because it was placed on a weekend...So on monday can I cancel this myself?
Thanks